DAMUInvestor inquiries

For tech founders and early employees

A real asset on a corner you know

100 affordable units at Sepulveda and Culver, near Apple's Culver City campus. Steel modules are made in a factory while the ground floor goes up on site.

October 2026 · Confidential

See why it fits
Rendering of the proposed building at 4301 Sepulveda Blvd, seen from the Sepulveda and Culver intersection.
Conceptual rendering. Design and approvals pending.

01Why it fits

Why it fits founders and early employees

  • A building, not a cap table. A corner of two boulevards, zoned for mixed use, near Apple, TikTok, Culver Steps and Helms Bakery. You can visit the site.
  • A team you can check. Brandon Krull, CEO of Onigiri Capital and a former AngelList investment partner, leads financial modeling and investor reporting. John Jung leads the raise. Trillium will manage the building.
  • Built in a factory. Steel modules are made indoors while the ground floor goes up, then trucked in and set by crane, floor by floor.
  • Two ways in, plainly. Preferred equity: a proposed 12% return, from $100K. Common LP equity: a share of project outcomes, from $300K. It's illiquid, and returns aren't guaranteed.

How it goes up

Built in a factory. Stacked on site.

Modules are made indoors while the podium goes up, then trucked in and set by crane.

  1. The site

    A corner on two boulevards

    About 14,400 SF at Sepulveda and Culver, zoned MU-1.

  2. On site

    The podium

    Shops on both boulevards. EV depot off the alley.

  3. Step 1

    Built off site

    Steel modules are made in the factory at the same time.

  4. Step 2

    Delivered and lifted

    Trucked in and set by crane, floor by floor.

  5. Step 3

    Stacked on the podium

    Five modular floors. 100 proposed units.

Floors built: 0 of 6
Isometric diagram: podium built on site, five modular floors stacked above, one module lowered by crane.

02The site

A corner in Culver City's tech and media hub

Aerial view of the site at Sepulveda and Culver Boulevards with Apple's Culver City campus marked nearby.
The site and Apple's Culver City campus.
  • Address4301 Sepulveda Blvd and 11220 Culver Blvd, Culver City
  • SiteAbout 14,400 SF, four parcels
  • ZoningMU-1, mixed use
  • BuildingPodium with shops and EV depot, five modular floors
  • NearbyApple's 536,000 SF Culver Crossings campus, TikTok, Culver Steps, Helms Bakery
Aerial of the existing one-story buildings on the site at the corner of Sepulveda and Culver.
The site today.

03Team

Who you're investing with

John Jung headshot

John Jung

Co-Founder, Brick Work

Entitlements, financing and investors. Originated the deal and leads the raise.

Brandon Krull headshot

Brandon Krull

CEO, Onigiri Capital

Former Alpha Deal founder and AngelList investment partner. Leads financial modeling and investor reporting.

Alex Irvine headshot

Alex Irvine

CEO, Irvine & Associates

LA land use and entitlements. Leads approvals and the density bonus.

Delivery partners

Demien Farrell headshot

Demien Farrell

CEO, West Modular

Steel modular. $500M+ delivered.

Bob Holden headshot

Bob Holden

CEO, Trillium Property Mgmt.

4,374 affordable units, 57 properties.

Team experience in Los Angeles

ProjectAddressUnitsStories
Liv DTLA1411 S Flower St2278
Vida DTLA1317 S Grand Ave1478
Premiere Hollywood1621 N McCadden Pl708

STS Construction Services and STS Development Services projects. Team experience, not Damu projects.

04Summary

The opportunity

100 affordable workforce units with a ground-floor EV depot. Build, lease and hold.

100Proposed units, all affordable
$28–29MCost before financing
12%Proposed preferred return
$100KPreferred minimum
$300KCommon LP minimum
  • Need. LA County is about 500,000 affordable units short.
  • Program. 25 studios, 50 one-bedrooms, 25 two-bedrooms.
  • Delivery. West Modular builds the modules. Trillium manages the building.
  • Structure. A preferred tranche at a proposed 12%, plus common LP equity. Rule 506(c), verified accredited investors only.

Planning assumptions, subject to design, pricing, City review and financing. Returns are not guaranteed.

05Terms

Two ways to invest

Preferred equity

Proposed 12% · $100K minimum · shared with the landowner

$500K cap

Common LP equity

Shares in project outcomes · terms under review

$300K min

Offering

Rule 506(c) · verified accredited investors only

506(c)

Preferred equity

12%

Proposed return. $100K minimum, $500K tranche cap.

Capital is at risk. Returns are not guaranteed, and the investment is illiquid.

06Budget

Preliminary cost

$28.1M – $29.1MBefore financing and reserves
  • $19.66MHard costs + contingency
  • $3.1–4.1MLand + closing
  • $4.0MSoft costs
  • $1.3–1.4MDeveloper fee

Rounded planning figures. EV depot fit-out not yet priced.

07Risks

What drives the outcome

Approvals

Path, income mix and covenant not yet confirmed.

Cost

Modular and site pricing pending; EV depot unpriced.

Rents

Rent caps and operating costs set income.

Financing

Debt terms and exit pricing set returns.

Investor inquiries

Damu Builds

John Jung · Co-Founder, Brick Work

  1. Review the materials and discuss terms.
  2. Receive the offering documents and do diligence.
  3. Verify accredited status before subscribing.
Damu Builds · 4301 Sepulveda, Culver City · ConfidentialOctober 2026